Skip to content
USA · India joint venture

Utilities & Environment

Water Treatment

Automated dosing and compliance monitoring for RO, ETP and STP systems.

Overview

What we do here

We integrate control systems for water-treatment plant builders and for industrial clients directly. Either way, the target is the same: automated dosing and monitoring that meets consent conditions every day, not only on the day of inspection.

What this floor demands

  • Dosing controlled manually against influent that varies far more than assumed
  • Compliance parameters logged by hand instead of monitored continuously
  • Membrane and filtration status not visible until a failure occurs
  • Legacy PLCs on treatment trains with no remote monitoring capability

In practice

Dosing that defends a discharge consent

An ETP or STP is a compliance asset before it is a process one. The control system's job is to keep the discharge inside consent and to be able to demonstrate it later: pH, TSS, COD and flow logged continuously, dosing pumps trimmed against live analyser feedback rather than a fixed timer, and every setpoint change attributed to a user. When a pollution board queries a reading, the answer should be a report, not a recollection.

For RO plants the economics sit in the recovery and the membranes. We monitor differential pressure and normalised permeate flow to schedule CIP on evidence instead of a calendar, and interlock the high-pressure pump against low feed pressure and out-of-range pH so a membrane stack is not damaged by a fault upstream. Remote alarming matters here too — most of these plants run unattended overnight, which is exactly when a dosing pump fails.

Scope

What we deliver here

Each item below is a package we build, install and support in-house — not a subcontracted line on a quote.

01

PLC-based dosing control responsive to real-time influent quality

02

SCADA integration with online compliance monitoring and reporting

03

Instrumentation for flow, turbidity, pH and conductivity verification

04

Remote monitoring for unattended or multi-site treatment plants

05

Obsolescence audits and controller migration on existing treatment trains

Standards we work toCPCB / GPCB consent normsIEC 61439IEC 62443

Proof points

Comparable work we have delivered

Centralised SCADA for generation and utility assets

SCADA & monitoring

Centralised SCADA for generation and utility assets

Scope: Protocol conversion, SCADA integration and remote monitoring across mixed-vendor assets.

Result: Single dashboard replacing individual OEM portals, with alarm notification on faults.

Let's build

Running a water treatment operation?

Send a scope, a drawing or just a problem statement. An engineer who knows this floor responds within one working day.