Skip to content
USA · India joint venture

Energy & Renewables

Solar

Monitoring, control and communication for rooftop and ground-mount arrays.

Overview

What we do here

Solar on an industrial site is a monitoring and communication job as much as an electrical one. We integrate SCADA, inverter communication and string-level monitoring so the array reports what it is actually generating.

What this floor demands

  • Inverter communication protocols that do not talk to the plant SCADA
  • String-level faults invisible until a measurable generation drop
  • Weather station and generation data not correlated for performance reporting
  • Remote sites with no centralised alarm or fault notification

In practice

Where solar sites actually lose generation

Almost none of the generation we recover on a solar site is recovered at the panel. It is recovered at the communication layer — a Sungrow or Sineng inverter speaking Modbus TCP on one subnet, a plant SCADA expecting IEC 61850 on another, and a string combiner box whose fault contact was never wired anywhere. We build the gateway and register map that closes that gap, then prove it with a point-to-point check against the inverter's own portal.

Once the data is trustworthy, performance ratio becomes a number you can argue with a vendor about. We correlate string-level current against pyranometer irradiance and module temperature, so a 4% shortfall resolves into a specific cause — soiling, a failed string fuse, clipping, or a genuine irradiance day. For rooftop plants on an operating factory, that reporting matters more than the array: it is what decides whether the captive-consumption case holds up at the end of the year.

Scope

What we deliver here

Each item below is a package we build, install and support in-house — not a subcontracted line on a quote.

01

SCADA integration for inverter, string and weather-station monitoring

02

Protocol conversion for mixed-vendor inverter fleets

03

Remote monitoring and alarm notification for unattended sites

04

Performance-ratio reporting correlated against irradiance data

05

AMC covering monitoring-system uptime and inspection

Standards we work toIEC 61439MNRE technical specificationsIEC 62443

Proof points

Comparable work we have delivered

Centralised SCADA for generation and utility assets

SCADA & monitoring

Centralised SCADA for generation and utility assets

Scope: Protocol conversion, SCADA integration and remote monitoring across mixed-vendor assets.

Result: Single dashboard replacing individual OEM portals, with alarm notification on faults.

Let's build

Running a solar operation?

Send a scope, a drawing or just a problem statement. An engineer who knows this floor responds within one working day.