Skip to content
USA · India joint venture

Utilities & Environment

Cooling Towers & Industrial Fans

Automated control that holds approach temperature year-round.

Overview

What we do here

A cooling tower quietly drifting off its approach temperature costs more than most plants realise, and manual logging rarely catches it in time. We automate control and monitoring for heat-rejection systems — and verify performance after handover.

What this floor demands

  • Fan and pump control running on fixed schedules instead of load-responsive logic
  • Approach-temperature drift going undetected between manual readings
  • Vibration and bearing condition unmonitored until failure
  • Multiple towers and fan banks with no centralised control point

In practice

Approach temperature is a control problem

A cooling tower rarely fails outright; it drifts. Approach temperature creeps up over a season, condenser pressure follows, and the chillers quietly consume more power for the same duty. We put fan speed under VFD control against measured approach rather than a fixed schedule, sequence multiple cells so they load evenly instead of one running against a stalled neighbour, and alarm on the drift itself so it surfaces as a maintenance job rather than an energy bill.

The mechanical protections belong in the same logic: vibration switches and gearbox oil-temperature interlocks wired to trip the fan and raise an event, not just cut power silently. On the water side we monitor conductivity and control blowdown against it, which holds cycles of concentration where they were designed to be — the single biggest lever on both make-up water consumption and scale on the fill.

Scope

What we deliver here

Each item below is a package we build, install and support in-house — not a subcontracted line on a quote.

01

VFD-based fan and pump control responsive to measured load and approach temperature

02

SCADA integration for centralised monitoring across multiple towers

03

Vibration and condition-monitoring instrumentation with alarm thresholds

04

Water chemistry dosing control integrated with the monitoring system

05

Performance verification against approach and range after commissioning

Standards we work toCTI performance standardsIEC 61439IEC 62443

Proof points

Comparable work we have delivered

Centralised SCADA for generation and utility assets

SCADA & monitoring

Centralised SCADA for generation and utility assets

Scope: Protocol conversion, SCADA integration and remote monitoring across mixed-vendor assets.

Result: Single dashboard replacing individual OEM portals, with alarm notification on faults.

Let's build

Running a cooling towers & industrial fans operation?

Send a scope, a drawing or just a problem statement. An engineer who knows this floor responds within one working day.